Skip to content
The Nexus
WORLDJul 31 · 17:15 UTCWXYZ ABC DETROIT

What to know about crossing the multi-use path on the Gordie Howe International Bridge

The Gordie Howe International Bridge's multi-use path for walkers and bicyclists opened Wednesday, operating daily from 8 a.m. to 8 p.m. with a 5% incline and 1.8-mile length. Parking is available at designated trailheads in Windsor and Detroit, and e-bikes are restricted during initial weeks. Travelers must present cross-border documents and follow safety guidelines like speed limits and pedestrian right-of-way.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting