Skip to content
The Nexus
TECHNOLOGYJul 9 · 04:50 UTCWPLG LOCAL 10 MIAMIAssociated Press

Meta plans billions for first AI data center in Canada, largest outside the US

Meta will invest over $9.1 billion to build its first AI data center in Canada, located in Sturgeon County, Alberta. The facility will be powered by a 932-megawatt natural gas-fired plant developed by a consortium including Pembina Pipeline Ltd. and will use a closed-loop cooling system to avoid water extraction from local sources.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting