Skip to content
The Nexus
TECHNOLOGYAug 9 · 08:55 UTCBLOOMBERGAndra Timu

Romania Extends Reactor Output by Nine Days After Danube Blasts

Romania can keep its second nuclear reactor at the Cernavoda plant operational for at least nine more days. This extension follows explosive works conducted on the Danube, which subsequently increased the flow of the river by 4cm (1.6 inches).

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting

Romania Extends Reactor Output by Nine Days After Danube Blasts · The Nexus