Skip to content
The Nexus
SECURITYJul 28 · 12:36 UTCPASADENA NOWGab Apo

Scaffolding Installed in Central Library Courtyard as Seismic Retrofit Advances

Scaffolding has been installed in Pasadena’s historic Central Library courtyard as part of an ongoing earthquake retrofit and renovation project. Construction crews have removed roof tiles to access high sections of the roof, emphasizing safety protocols throughout the process.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting

Scaffolding Installed in Central Library Courtyard as Seismic Retrofit Advances · The Nexus