Skip to content
The Nexus
DossierENTITY

C&O Canal

Coverage of C&O Canal in the Nexus archive.

Earliest in view: Jun 10 · 11:15 UTCMost recent: Jun 15 · 23:02 UTC
Co-mentioned in this coverage
Recent coverage
  • SECURITYJun 15 · 23:02 UTCWTOP DC
    Emergency work underway on Potomac Interceptor in Maryland to protect drinking water

    DC Water has initiated emergency repairs on a corroded 1,700-foot section of the Potomac Interceptor sewer line near Lock 22 on the C&O Canal in Maryland. A spill at this location could threaten the drinking water intakes for WSSC Water and Washington Aqueduct, though Fairfax Water’s intake would remain unaffected. Crews are installing a temporary bypass system while the compromised pipe is replaced, with work expected to last through September.

  • TECHNOLOGYJun 10 · 11:15 UTCWTOP DC
    DC Water to start emergency repairs on Potomac Interceptor to protect local drinking water supply

    DC Water is initiating emergency repairs on a deteriorating section of the Potomac Interceptor sewer line in Potomac, Maryland, to protect drinking water intakes for WSSC Water and the Washington Aqueduct. Inspections revealed structural issues like corrosion and exposed rebar, prompting immediate action. Repairs, starting June 15, 2026, will include building an above-ground bypass pipeline and monitoring equipment, with construction expected to continue until September 2026.

C&O Canal · Dossier · The Nexus