Skip to content
The Nexus
BUSINESSAug 26 · 11:05 UTCNASHVILLE BANNERBanner Staff

Aug. 26: John C. Tune Airport Addition; Shelby Park and Bottoms Trail

Atlantic Aviation has begun construction of a fixed-base operator terminal at John C. Tune Airport, slated for completion late in 2027. Separately, work began on the final phase of the Sevier Lake loop trail project at Shelby Park and Bottoms, which is expected to provide an ADA-compliant surface with enhanced safety features.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting

Aug. 26: John C. Tune Airport Addition; Shelby Park and Bottoms Trail · The Nexus