Skip to content
The Nexus
BUSINESSAug 24 · 03:42 UTCBLOOMBERGJessica Zhou

Zijin Says Copper Target Under Pressure After Congo Mine Flood

Zijin Mining Group Co. reported that its full-year copper production target is under pressure due to flooding at a major Congolese mine. This issue contributes to global supply concerns for the metal, especially as copper trades near a record high.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting