POLITICSTHE HINDU NATIONAL
Canal restoration to be expedited to curb waterlogging in Kochi
The Mullassery Canal restoration in Kochi will resume on September 1 and conclude by March to address waterlogging. Authorities will intensify inspections against banned single-use plastic and implement urgent measures like drain cleaning and shop relocation over drains.
Mentioned
Related Signal
Adjacent reporting
- Kerala HC seeks report on steps to declog canals, drains, and ensure safe roads in Kochi
- Pre-monsoon works spared city of major waterlogging: Kochi Mayor
- Drainage work begins on Koorkenchery–Kuruppam road in Thrissur to tackle waterlogging
- Kerala floods 2026: clean-up begins in Kottayam as rain fury leaves trail of destruction
- Kuzhikandam creek rejuvenation in Kochi: greens flag inordinate delay as PCB told to redraw implementation plan