Skip to content
The Nexus
WORLDAug 5 · 15:24 UTCWDIV CLICKONDETROITSamantha Sayles

Gordie Howe International Bridge’s multi-use path reaches temporary capacity on U.S. side

The Gordie Howe International Bridge's multi-use path opened on August 5, allowing toll-free pedestrian and bicycle crossings between Michigan and Canada. The path, separated by concrete barriers, temporarily closed on the U.S. side due to high demand but is set to reopen at 12 p.m. the same day.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Gordie Howe International Bridge’s multi-use path reaches temporary capacity on U.S. side · The Nexus