Skip to content
The Nexus
SECURITYAug 5 · 14:13 UTCWAVY10 NORFOLKDana Hazzard

VIDEO: HRSD assessing pipeline failure on Douglas Ave in Portsmouth

The Hampton Roads Sanitation District is addressing a pipeline failure on Douglas Avenue in Portsmouth. Contractors are assessing damage, making repairs, and conducting cleanup efforts after a 30-inch force main failed.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
VIDEO: HRSD assessing pipeline failure on Douglas Ave in Portsmouth · The Nexus