Skip to content
The Nexus
SECURITYAug 1 · 00:28 UTCKMGH DENVER7Adria Iraheta

Xcel Energy starts work to bury 50 miles of power lines to cut wildfire risk across Colorado

Xcel Energy is burying 50 miles of power lines in Colorado by 2027 to reduce wildfire risks, following the destructive Marshall Fire. The initiative, part of a $1.9 billion investment approved by the Colorado Public Utilities Commission, includes vegetation management and AI fire detection. Public Safety Power Shutoffs (PSPS) have been implemented, but some residents advocate for underground lines despite high costs.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting