Skip to content
The Nexus
TECHNOLOGYJul 30 · 06:33 UTCTHE HINDU NATIONAL

Newly built approach road to bridge caves in after heavy rains in Dehradun

A newly built approach road to a bridge in Dehradun has collapsed after heavy rains. The repaired bridge and the newly constructed approach road were built at a combined cost of ₹16 crore.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting

Newly built approach road to bridge caves in after heavy rains in Dehradun · The Nexus