Skip to content
The Nexus
BUSINESSJul 29 · 12:51 UTCKRDO ABC COLORADO SPRINGSScott Harrison

Pueblo starts initial steps toward bridge project to connect two closed ends of 24th Street on West Side

Pueblo has begun initial steps for a bridge project to connect the two closed ends of 24th Street on the West Side, including a feasibility study and public open house. The bridge, which would cross railroad tracks between Atlanta Avenue and Adrian Avenue, is in the design phase with no timeline, cost estimate, or funding source determined yet.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting