Skip to content
The Nexus
BUSINESSJul 14 · 23:51 UTCBATON ROUGE BUSINESS REPORTDillon Lowe

A $185M wastewater project will soon break ground in Ascension Parish

National Water Infrastructure will break ground in September 2023 on a $185 million wastewater treatment plant in Ascension Parish, Louisiana, aiming to replace 72 smaller plants and improve water quality by discharging treated wastewater into the Mississippi River. The project, expected to take two years, is privately funded and projected to save the parish $4 million annually.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting