HEALTHKITV4 HONOLULU
H-1 closure to install temporary pedestrian bridge
Construction crews closed the H-1 in both directions between Middle Street and the Likelike Highway off-ramp from 8 p.m. Saturday until 8 a.m. Sunday. This closure is part of a major project aimed at reducing traffic congestion and enhancing pedestrian safety.
Mentioned
Related Signal