Skip to content
The Nexus
POLITICSJul 10 · 08:08 UTCTHE HINDU NATIONAL

34-metre cycling track stretch removed in Narsingi for U-turn to decongest traffic flow

A 34-metre cycling track in Narsingi was removed to create a U-turn aimed at reducing traffic congestion by 30%, according to traffic police. Cyclists, however, argue that the repeated removal of dedicated cycling infrastructure raises concerns.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting