Skip to content
The Nexus
TECHNOLOGYJun 12 · 15:06 UTCWSMV4 NASHVILLETony Garcia

Portion of downtown Franklin to close for water project

The city of Franklin is closing Third Avenue South between Church Street and the Square from June 15 to June 17 for water main construction. The project involves connecting a new service line to the existing water main, with crews working 9 a.m. to 3 p.m. The city acknowledges potential frustrations and asks for public patience.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting