Skip to content
The Nexus
BUSINESSApr 30 · 14:38 UTCTHE BLOCKBrian Danga

Bitcoin miner MARA to acquire Long Ridge in $1.5 billion Ohio gas plant deal

MARA, a Bitcoin miner, will acquire an Ohio natural gas plant operator for $1.5 billion, shifting its focus from Bitcoin mining to digital infrastructure.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this